Dick
smith warehouse
Address: Davidson Street Chullora
Mech. contractor: McNeall air conditioning.
Builder: St Helliers
Duration: Oct-2000 start, April-2001 finish.
The building
consisted of 2-floors of offices and warehouse. The offices were divided to
4-sections and air conditioned by split ACU's. The system was supplied from
4-MCC's. Each zone had 4-after hours switches. The temperature is controlled
by a separate electronic controller per unit, which are installed in our MCC's.
The warehouse
high temperature is extracted by 2-exhaust fans which are mounted on a high
level.